Email SMS This Cite

New Steps of the South Portico Being Erected during the White House Renovation

Date:
1952-01-04T00:00:00
Description:
Caption: New steps of the South Portico are being erected during the White House renovation. The steps and facing are of Missouri limestone with a concrete base.
Subject:
Building repair and reconstruction, Dwellings, Historic buildings, Presidential residences, Renovation (Architecture)
Partner:
National Archives and Records Administration
Part of:
Photographs Relating to the Administration, Family, and Personal Life of Harry S. Truman
Source:
https://catalog.archives.gov/id/6993214
More Like This
  • Southwest View of the North Portico of the White House during the Renovation Caption: The southwest view of the North Portico of the White House during the renovat...
  • [Monticello]: north portico [Monticello]: north portico 1 page Dimensions: 19.3 cm x 8.8 cm (7-5/8" x 3-1/2") Original manuscript from the Coolidge Collection of T...
  • Monticello: temple or portico Monticello: temple or portico 1 page Dimensions: 7.4 cm x 20.5 cm (2-15/16" x 8-1/16") Original manuscript from the Coolidge Collecti...
  • Monticello: portico and terrace benches Monticello: portico and terrace benches 1 sheet, 2 pages Dimensions: 18.1 cm x 6.6 cm (7-1/8" x 2-5/8") Original manuscript...
  • Monticello: ionic portico and dome Monticello: ionic portico and dome 1 sheet, 2 pages Dimensions: 20.1 cm x 16 cm (7-15/16" x 6-5/16") Original manuscript from th...